Summary
MCE conducted a comprehensive desktop assessment of the project’s four sites, ensuring alignment with the project requirements outlined by Bundaberg Regional Council (BRC). Upon successful completion MCE demonstrated its ability to deliver results that met BRC’s objectives. This included conducting a technical review of site surveys, providing detailed design reports, and producing construction engineering design drawings with RPEQ certification. This project demonstrates MCE commitment to delivering quality outcomes within the specified timeline.